Import-Export Bulletin Board HORIZON FORMWORK CO., LTD. Logo

Home > Offers to Sell > Minerals & Metals > Metal Products > Cast & Forged

Contact: Mr. H. Chang
Company: HORIZON FORMWORK CO., LTD.
VICTORIA HOTEL BUILDING, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Xingtai 054000
China
Phone: 86-319-3188757
Fax: 86-319-3156299
E-Mail: Send Inquiry
Date/Time:  10/23/17 1:56 GMT
 

Adjustable Scaffolding Steel Prop , Building Support Props Q345 Steel Pipe

Adjustable telescopic steel props for slab formwork construction and post shoring Steel prop is an important scaffolding component of HORIZON formwork system, especially in the slab formwork. With the props high loading capacity, low weight and stability, HORIZON slab formwork works safely and efficiently on site as well as cost-effective. Also, the prop is fast and easy for handling on site. - - - - Specification Capacity (KN) Height (mm) Dia (mm) Weight (Kg) HZP30-300 30 1650-3000 75/60 20.9 HZP30-350 30 1970-3500 75/60 23.0 HZP30-400 30 2210-4000 75/60 25.0 HZP20-300 20 1650-3000 60/48 15.7 HZP20-350 20 1970-3500 60/48 16.6 HZP20-450 20 2460-4500 60/48 28.2 HZP20-500 20 2710-5000 60/48 30.5 - - - - Advantages: 1. High quality steel tubes ensures its high loading capacity. 2. Various finishing are available, such as: hot-dipped galvanization, cold galvanization, powder coating and painting. 3. Special design prevents the operator from hurting his hands between the inner and outer tube. 4. The inner tube, pin and adjustable nut are designed protected against unintentional disengagement. 5. With the same size of the plate and base plate, the prop heads are easily to insert in the inner tube and outer tube. 6. The strong pallets ensure the transportation easily and safely. Packing: 1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 2. Different packages are used for different products: ---bundles: timber beam, steel props, tie rod, etc. ---pallet: small parts will be put in bags and then on pallets. ---wooden cases: it is available on customer's request. ---bulk: some irregular goods will be loaded in bulk in container. Delivery: 1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 2. Transportation: It depends on the destination charge port. 3. Negotiation is needed for special requirements. Who we are: HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. What we offer: Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. On-site supervising support is available on request. Why us: With 10 years of experience, we know exactly what you need; Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. Prompt action on customer's requirments. We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. HORIZON FORMWORK, your reliable formwork partner!

Minimum Order: 1 pieces

Adjustable Scaffolding Steel Prop , Building Support Props Q345 Steel Pipe
Enlarge Click to Enlarge
SOURCE: Import-Export Bulletin Board (http://www.imexbb.com/)
Report Abuse

Involved in International Trade? Become an Advertiser!

Post an Offer to Sell

© 1996-2010 IMEXBB.com. All rights reserved.

IMEXBB.com