Import-Export Bulletin Board  

Home > Offers to Sell > Electronics & Electrical > Passive Components > Other PCB & PCBA

Contact: Eileen Wong
Company: Shenzhen Grande Electronic Co., LTD
Room A510-512 Car Tower, No.45 Zhenhua Road, Futian District, Shenzhen, 518031
Shenzhen 518031
China
Phone: 86-755-83261869
E-Mail: Send Inquiry
Date/Time:  11/19/18 1:15 GMT
 

EDM Machine Quick-Turn PCB Assembly / Immersion Gold

Supplier: Shenzhen Grande Electronic
Layers: 4
PCB:FR-4/1.6mm, 1oz finished copper
Specialty: Large current, High heat, heavy components
Surface Treatment: HASL
PCBA Lead time:2-3 weeks
Packing: Anti-static bag and compartmental packing
Twist: <0.75%

【Description】
1, PCBA turnkey solution for EDM Machine Quick-Turn PCB Assembly / Immersion
Gold.
2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.
3, Electronic Manufacturing Service.
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, the Internal Circuit Test (ICT) , Function Test (FCT)
8, Sample and small batch order are accepted.


PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA
Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line workers wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-
flow, Wave Soldering and Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D
CMM,X-
Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3,
FR-1,
94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed. 
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing


【Description】
PCB layout Features:
1, Huge board with perfect layout
2, Various machine interfaced, equal-length for high speed traces

PCB Fabrication:
Layers: 4
Size: 261*128*1.6mm
Surface Treatment: Im Au
Material: FR-4/HTg170, 2oz finished copper
Impedance Control Tolerance: +/-10%
Others: 4/4mil, Via:8mil

Minimum Order: 1 pieces

EDM Machine Quick-Turn PCB Assembly / Immersion Gold
Enlarge Click to Enlarge
SOURCE: Import-Export Bulletin Board (http://www.imexbb.com/)
Report Abuse
 

Involved in International Trade? Become an Advertiser!

Post an Offer to Sell

© 1996-2010 IMEXBB.com. All rights reserved.

IMEXBB.com