Import-Export Bulletin Board  

Home > Offers to Sell > Others & Excess Inventory > Others

Contact: Eileen Wong
Company: Shenzhen Grande Electronic Co., LTD
Room A510-512 Car Tower, No.45 Zhenhua Road, Futian District, Shenzhen, 518031
Shenzhen 518031
China
Phone: 86-755-83261869
E-Mail: Send Inquiry
Date/Time:  8/23/19 8:50 GMT
 

Multilayer LED Light Turnkey PCB Assembly Service

Supplier: Shenzhen Grande Electronic
 Layers: 4
 Project:  Multilayer LED Light Turnkey PCB Assembly Service
 PCB: FR4/1.6mm/1oz
 Min Via: 0.2mm
 Surface Treatment: HASL
 Packing: Anti-static bag and compartmental packing
  Standard Warp: <0.75%
 PCBA Lead time: 3-4 weeks



【Description】
1,Turnke , y solution for Multilayer LED Light Turnkey PCB Assembly Service
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing 
3, Electronic Manufacturing Service
4, SMT&DIP&PTH&BGA
5, Components Sourcing 
6, Quick PCBA prototype
7, X-ray test, ICT and Functional Circuit Test 
8, Sample and small batch order are accepted.

PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA
Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-
flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D
CMM,X-
Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3,
FR-1,
94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed. 
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing

Minimum Order: 1 pieces

 Multilayer LED Light Turnkey PCB Assembly Service
Enlarge Click to Enlarge
SOURCE: Import-Export Bulletin Board (http://www.imexbb.com/)
Report Abuse

Involved in International Trade? Become an Advertiser!

Post an Offer to Sell

© 1996-2010 IMEXBB.com. All rights reserved.

IMEXBB.com