Import-Export Bulletin Board Wuhan CenterRise M&C Engineering CO., Ltd. Logo

Home > Offers to Sell > Industrial Machinery & Equipment > Measuring & Analyzing Instruments > Others

Contact: Floria Liang
Company: Wuhan CenterRise M&C Engineering CO., Ltd.
Building 4, Hengxin Industrial Park, No. 8 Xinhua Avenue, Huangpi District
Wuhan 432200
China
Phone: 13995588597
E-Mail: Send Inquiry Member for over 1 year
Date/Time:  7/24/23 8:37 GMT
 

Ladle Comprehensive Management System

Overview:

In the steelmaking production process, the ladle is the key equipment for
holding molten steel, secondary refining, and continuous pouring. In a
modern steelmaking plant, refractory materials are required for converters,
refining, and ladles. In the steelmaking process, ladle is the most
important part in the use and consumption of refractory materials. Improving
the service life of ladles and reducing refractory consumption is the key
technology for steelmaking plants to save costs and reduce energy
consumption for green production.

In order to ensure the orderly operation of the ladle, save the consumption
of refractory materials, prolong the service life of the ladle, and ensure
the safe operation of the ladle, Wuhan CenterRise M&C Engineering CO.
developed and launched the LDT-N200 integrated management system for the
ladle.



Introduction:

LDT-N200 ladle integrated management system integrates LDT-L200 ladle lining
thickness gauge, TBP-S300 ladle, tundish baking temperature and leakage
monitoring system, RFD -C100 metallurgical electronic positioning system,
and also integrates SQL Server database and NeuralWare (American computer
software company) neural network software NeuralWorks to realize intelligent
and optimized management of ladles.

LDT-L200 ladle lining thickness gauge uses a laser area array scanning
sensor to accurately measure the real-time thickness of the ladle lining,
calculate the lining loss, and predict the service life of the ladle.

TBP-S300 ladle, tundish baking temperature and leakage monitoring system
uses infrared thermal imaging camera and embedded armor wire system to
comprehensively monitor and prevent ladle leakage.

RFD-C100 metallurgical electronic positioning system installs RFID
electronic tags on all ladles to realize full-time and full-space ladle
positioning and tracking.

LDT-S200 ladle optimization control and analysis software, based on SQL
Server database, B/S network structure, realizes online management of
ladles, and adopts BP neural network system to realize intelligent
optimization control of ladles.

LDT-N200 ladle integrated management system can realize ladle age management
based on ladle lining data and neural network algorithm, safety process
control of ladle turnover and use, full-time tracking management of
steelmaking production and full-space tracking management of ladle use and
provide optimal control and management of steelmaking production and ladle
maintenance. Comprehensive ladle measurement and monitoring, ladle
positioning and management, and data management and optimization enable the
LDT-N200 ladle integrated management system to fully realize ladle entire
process management, optimize the service life of ladles, and comprehensively
reduce the cost of refractory materials.



The features:

Using a lining thickness gauge to measure the thickness of the ladle lining

Using infrared thermal imaging camera/embedded armor wire to realize ladle
leakage detection

Using RFID/number plate recognition to realize the location management of
ladles

Ladle age management system based on overall tracking

Overall (full-time full-space) ladle management system based on database

Provide overall production scheduling data

Using neural network to predict ladle service life based on big data

Ladle Optimal Scheduling System based on database and ladle service life

Increase the service life of ladle by 12%-20%

Reduce the use of refractory materials more than 15%

Realize orderly management of ladle baking

Realize full space and full time domain control

Reduce the costs of ladle management and maintenance

Improve the efficiency of ladle turnover operation

Minimum Order: 1 sets

Ladle Comprehensive Management System
Enlarge Click to Enlarge
SOURCE: Import-Export Bulletin Board (https://www.imexbb.com/)
Report Abuse

Post an Offer to Sell

© 1996-2010 IMEXBB.com. All rights reserved.

IMEXBB.com