Import-Export Bulletin Board Post an Offer to Sell

New here? Please subscribe
to post trade leads. It's FREE!

Real Estate


Home > Offers to Sell > Construction & Real Estate > Real Estate

Browse leads by category:
    
 
 
 

Summary of 9/28/26 9:47 GMT:>> Show Compact View
12/22/21 6:11 GMT
Industrial High Strength Multi Storey Frame Design Structural Steel Buildin

Industrial High Strength Multi Storey Frame Design Structural Steel Building Construction Supplier Structural steel is widely used in the steel building field with the advantage of short construction period and lower total cost compared with traditional civil construction method. The steel structure fabrication is a multifaceted process that requires specialized knowledge, skills, and resources to complete successfully. To create structural steel beams, components, or equipment, a good metal fabricator follows a specific process: Industrial High Strength Multi Storey Frame Design Structural Steel Building Construction 0 Industrial High Strength Multi Storey Frame Design Structural Steel Building Construction 1 Step 1: Ideation The ideation stage can be as creative or as standard as the client desires. Whether you need components for platforms or straightforward caged ladders, we can adhere to your exact needs. Step 2: Blueprint/Drawing Creation During ideation, we will listen to you and draw up blueprints using specialized engineering software. You can come prepared with your own blueprints or drawings for this stage. Review our blueprints to verify correct requirements, code compliance, and specifications. Step 3: Convert Blueprints Into Shop Drawings We will convert project blueprints into shop drawings for the fabrication. The shop drawings and plans will adhere to the logistics of your project, such as deadlines and budget. Shop drawings are what the manufacturer uses to bring the blueprints to fruition. Step 4: Cut and Drill Steel Beams We will have special tools, such as saws, shears, lasers, punches, notches, and plasmas to cut and drill the steel beams according to project blueprints. At KAFA, we use advanced equipment and facilities to the process the steel components. This advanced equipment produces higher quality results, faster. Step 5: Piece Etching We will etch each piece with a unique part number and plate location. This makes final assembly on site fast, easy, and accurate, eliminating costly mix-ups and project delays. Step 6: Component Assembly Once finish cutting and forming the components of your project, we will weld and assemble the pieces. At this stage, the fabrication team will check to make sure all pieces assemble correctly and match order specifications.

Contact:
Phone:
Fax:
Email:
Mr. Henin Wong
13553039170

Send Inquiry
Qingdao KaFa Fabrication Co., Ltd.
Dazhushan Industrial zone , Huangdao District, Qingdao City.
Qingdao 266000
China
12/17/21 2:21 GMT
Prefabricated Steel Structure Logistics Park Steel Structure Building

Prefabricated Steel Structure Logistics Park Steel Structure Building With the development and growth of the logistics industry, steel structure warehouses are constantly updated. Many traditional warehouse functions are increasingly unable to meet the rapid development of the logistics industry. New automated steel structure warehouses are replacing traditional warehouses, and steel structures have become the main structure of logistics warehousing. Steel structure logistics warehouse is an important part of the logistics industry, this kind of warehouse is a kind of warehouse with a high level of technology at present. Shelves, lane stackers, warehouse direct working platforms, automatic access and operation control systems are the main parts of the warehouse combination. The shelf is made of steel structure. The outstanding advantage is to realize the reasonable operation of the warehouse structure, maintain automation and simplify the operation. It uses computer or bar code technology in management. Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure Design, Manufacture & Installation. Specification of steel structure material: Items Specification Main Steel Frame Column Q235, Q345 Welded H Section Steel Beam Q235, Q345 Welded H Section Steel Secondary Frame Purlin Q235 C and Z purlin Knee brace Q235 Angle Steel Tie Rod Q235 Circular Steel Pipe Brace Q235 Round Bar Vertical and Horizontal Support Q235 Angle Steel, Round Bar or Steel Pipe Maintenance system Roof Panel EPS Sandwich Panel / Glass Fiber Sandwich Panel / Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet Wall Panel Sandwich Panel / Corrugated Steel Sheet Accessories Window Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window Door Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door Rainspout PVC Live load on Roof In 120kg/Sqm (Color steel panel surrounded) Wind Resistance Grade 12 Grades Earthquake-resistance 8 Grades Structure Usage Up to 50 years Temperature Suitable temperature.-50°C~+50°C Certification CE, SGS, ISO9001:2008, ISO14001:2004 Finishing Options Vast array of colors and textures available Paint Options Alkyd paiting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. Prefabricated Steel Structure Logistics Park Steel Structure Building 0

Contact:
Phone:
Fax:
Email:
Mr. steven
18661691560

Send Inquiry
Qingdao Ruly Steel Engineering Co.,Ltd
Tieshan Industrial zone, Huangdao District, Qingdao City.
Qingdao 266000
China
12/9/21 8:10 GMT
1562 D.O.T Push In Union

Product Features: Brass Collet Buna N O-ring Stainless Steel Tube Support Meets D.O.T. FMVSS571.106 Meets SAE J2494 & SAE J2494-3 Markets: Heavy Duty Truck Trailer Mobile Applications: Air Brakes Air Tanks Air Ride Sliders Tire Inflation Primary & SecondaryAir Lines Compatible Tubing: SAE J844 Type A & B nylon tubing Reference Part No: AQ62DOT - 62PMT - 1862 - DQ62DOT - 1562-DOT

Minimum Order: 1000

Contact:
Phone:
Fax:
Email:
coppertubing
8613989513573
+86-575-87560582
Send Inquiry
Zhuji Qinwei Hydraulic & Pneumatic Components Co.,
Xingzhong Road DianKou Town Zhuji City Zhejiang Province China
Zhuji 311800
China
11/26/21 6:16 GMT
Anti Corona Virus Mobile Cabin Hospital Shelter Container Clinic Isolation

Anti Corona virus Shelter container Hospital/ Container Clinic Isolation Room For the Container Hospital/ Container Clinic isolation room, we have three styles, folding container isolation room, flat pack container isolation room and expandable container isolation room. All these container isolation room, have the simple electric systerm. A: FOLDING CONTAINER ISOLATION ROOM 2.5MX5.8MX2.6H, 1*40HQ can load 12 units. Advantage: 4 minutes can install one house, fast installation. B: FLAT PACK COTNAINER ISOLATION ROOM 2.425MX5.9MX2.8H,1*40HQ can load 9 units. Advantage:with complete roof and floor, 2 hours can install one house. C: EXPANDABLE CONTAINER ISOLATION ROOM 5.8MX5.894MX2.5H, 1X40HQ can load 2 units Advantage:expandable butterfly design,2 hour can install one house. Container home design have toilet, inside the toilet have sitdown toilet, wash basin, shower room, fan, and mirror. Teachnical Features: Design Folding container house 2.5MX5.8MX2.6H flat pack container house 2.425MX5.9MX2.8H Expandable container house Closing Size 5.8MX2.2MX2.5H Opening Size 5.8MX5.894MX2.5H Wind resistance: Grade 11 Earthquake resistance: Grade 8 Snow load capacity of roofing: 0.6kn/m2 Live load capacity of roofing: 0.6kn/m2 Wall permitted loading: 0.6kn/m2 Wall & Roof materials 20mm EPS/ ROCK WOOL/ IEPS Door Steel door Window Aluminum silding window External and internal wall heat transmission coefficient: 0.35kcal/m2hc Wall and roof panel: EPS/IEPS/Rock wool/PU Weight of the container: 1.3T (EPS) Density of cement board: 37kg/m2 Delivery time: Normally 10-25 days Design Customized Anti Corona Virus Mobile Cabin Hospital Shelter Container Clinic Isolation Room 0 Anti Corona Virus Mobile Cabin Hospital Shelter Container Clinic Isolation Room 1

Contact:
Phone:
Fax:
Email:
Spring Wu
13606193016

Send Inquiry
Sussman Modular House (Wuxi)Co.,Ltd
NO.8 Keji road, Ehu town, Xishan district, Wuxi,Jiangsu province,China, 214000
Wuxi 214000
China
11/22/21 7:11 GMT
22618D Flange Part Fitting

Material: Carbon Steel Pressure: High Pressure Work Temperature: Normal Temperature Outer Packing: Carton Packing with Pallet or as Request Inner Packing: Plastic or as Request Transport Package: Box or Pallet HS Code: 7307990000 Yuyao Hermanted Pipe Fitting Co., Ltd is professional China 22618D Flange Part Fitting suppliers and custom 22618D Flange Part Fitting manufacturers. We also custom 22618D Flange Part Fitting which are used for home and industrial use. We have been able to cooperate with our customers from more than 20 countries so successfully for so many years.

Minimum Order: 1000

Contact:
Phone:
Fax:
Email:
Yuyao Hermanted Pipe Fitting Co., Ltd.
+86-574-62963897
+86-574-62963897
Send Inquiry
Yuyao Hermanted Pipe Fitting Co., Ltd.
Luojiang Village, Hemudu County, Yuyao City, Ningbo City, Zhejiang Province, China
Yuyao 315415
China


SOURCE: Import-Export Bulletin Board (https://www.imexbb.com/)
Result Page:   << Previous   |   1  |   2  |   3  |   4  |   5  |   6  |   7  |   8

Post an Offer to Sell
Home - Offers to Buy - Business Opportunities - Company Profiles

© 1996-2026 IMEXBB.com. All rights reserved.

IMEXBB.com